Executive Summary
This section crystallizes your entire business proposition into a concise, compelling snapshot. It’s the make-or-break element for investors and lenders, establishing credibility through quantifiable market opportunity, differentiated value, and realistic financial projections. For service businesses like irrigation installation, it must prove you understand both the technical complexities of the trade and the local market dynamics that drive revenue.
Example: GreenFlow Irrigation Solutions’ Executive Summary
GreenFlow Irrigation Solutions, LLC targets Austin’s $1.8 million serviceable irrigation market with a water-efficiency focused installation model. Founded by James Carter (12-year irrigation veteran), the company addresses Central Texas’ critical water scarcity through smart technology integration—projected to reduce client water usage by 35-40% versus conventional systems. Unlike competitors who treat irrigation as an add-on service, GreenFlow’s exclusive focus enables specialized expertise in municipal compliance (City of Austin Water Conservation Ordinance §15-12) and hyper-local soil conditions (clay-dominant Blackland Prairie zone).
Our financial trajectory demonstrates disciplined scaling from a lean Year 1 operation to sustainable profitability by Month 14. The $150,000 startup capital—$120,000 SBA 7(a) loan and $30,000 owner equity—is allocated to critical revenue-generating assets rather than overhead. Key differentiators driving our 65% sales close rate projection include:
- 100% water-efficiency guarantee with annual third-party audit
- Transparent pricing portal showing real-time equipment costs
- Smart controller integration (Rachio 3/Hunter Hydrawise) as standard
Year 1 focuses exclusively on high-margin residential installations ($5,200 average ticket), deliberately avoiding unprofitable emergency repair work that erodes margins for competitors. Commercial projects are strategically limited to HOAs and property managers with multi-year maintenance contracts attached.
| Financial Snapshot | Year 1 | Year 2 | Year 3 |
|---|---|---|---|
| Total Revenue | $400,000 | $680,000 | $1,007,000 |
| Gross Profit Margin | 58.3% | 62.1% | 64.8% |
| Net Profit | $112,600 | $268,000 | $427,000 |
| Cash Flow from Operations | $98,200 | $235,400 | $398,600 |
| Customer Acquisition Cost (CAC) | $285 | $220 | $195 |
| Customer Lifetime Value (LTV) | $2,150 | $2,840 | $3,410 |
Break-even analysis confirms viability: With $272,727 in fixed costs and 55% contribution margin per job, we achieve profitability at 52 residential installations. Historical data from the Texas Department of Licensing and Regulation (TDLR) shows Austin-area installers average 70+ residential jobs annually, validating our conservative 60-job Year 1 target.
Operational Nuance: We deliberately excluded lawn care and pool services from our scope despite higher marketing ROI—these require separate licensing (TDLR #22500) and would dilute our water-efficiency positioning. Specialization drives premium pricing in our $3.5k-$7k residential sweet spot.
Capital efficiency is baked into our model: The $32,000 Ford F-250 serves dual purposes as mobile showroom (with demo smart controller) and equipment transport, avoiding separate sales vehicle costs. Loan terms leverage SBA 7(a) advantages—a 10-year term with 12-month principal deferment aligns perfectly with our 14-month break-even projection.
Company Overview
This section establishes your business’s legal and operational foundation. For service contractors, it’s critical for proving compliance readiness and operational credibility to both clients and regulators. You must detail ownership structure, management expertise, and facility logistics to demonstrate you’ve addressed the unique risks of field service businesses—like equipment liability and technician certification.
Example: GreenFlow Irrigation Solutions’ Company Overview
GreenFlow operates as a Texas LLC (Certificate of Formation #802456789) with management structure optimized for field service scalability. The 60/40 owner-investor split ensures operational control remains with James Carter while securing non-dilutive capital—critical for a business where owner expertise directly impacts service quality. Our North Austin warehouse location was selected through GIS analysis of Travis County water restriction zones (Stage 3+ areas prioritized) and proximity to I-35 for 30-minute response times to 85% of target ZIP codes.
| Ownership Structure | Equity | Capital Contribution | Operational Role |
|---|---|---|---|
| James R. Carter (Managing Member) | 60% | $15,000 + Sweat Equity | Full-time CEO & Lead Technician |
| Sarah Lin (Investor Member) | 40% | $30,000 Cash | Non-Participating; Quarterly Financial Reviews |
Key personnel decisions reflect irrigation industry burnout realities: Maria Delgado (Year 2 Field Manager hire) receives profit-sharing (5% of crew revenue) to retain talent in a field with 32% annual technician turnover (IBISWorld 2023). David Wu’s contract marketing role avoids full-time salary costs during the volatile startup phase—his success-based compensation ($500 per closed job) aligns with our $285 CAC target.
Facility operations follow strict inventory protocols: All PVC pipe and backflow devices are serialized and tracked via Jobber software to meet Texas Water Development Board audit requirements. The warehouse’s 200 sq. ft. service bay includes EPA-compliant solvent disposal for PVC cement (Texas Commission on Environmental Quality Rule 335.204), avoiding $10,000+ fines for improper handling.
| Required Licenses & Timeline | Cost | Renewal Cycle | Regulatory Body |
|---|---|---|---|
| Texas Landscape Irrigation License (TDLR #123456) | $450 | Biennial | TDLR |
| Austin Water Utility Backflow Tester Certification | $225 | Annual | City of Austin |
| Texas Contractor Bond ($25,000) | $250 | Annual | State of Texas |
| General Liability Insurance ($1M) | $4,200 | Annual | Progressive Commercial |
Local Compliance Tip: Austin requires separate permits for irrigation work in designated “Critical Water Quality Zones” (e.g., Barton Springs Edwards Aquifer). We budget $75/permit and factor 3-day approval delays into project timelines—avoiding the $500/day fines competitors incur from rushing installations.
Market Analysis
For local service businesses, this section must prove you’ve moved beyond generic industry reports to understand hyper-local demand drivers. It should quantify addressable work within your service radius, analyze competitor weaknesses in your specific territory, and validate pricing assumptions against actual neighborhood demographics. Without this granular focus, your business model remains theoretical.
Example: GreenFlow Irrigation Solutions’ Market Analysis
Austin’s irrigation market is fragmented but growing rapidly due to three converging forces: 1) 42% population growth since 2010 (U.S. Census), 2) Municipal Stage 3 water restrictions (triggered at 40% reservoir capacity), and 3) $150M in new commercial development along US-183 corridor. Crucially, our SOM analysis excludes DIY installations (45% of market per IBISWorld) as non-targetable, focusing only on professionally installed systems.
Travis County’s 2023 water audit revealed 68% of existing residential systems operate at 45% efficiency or lower due to outdated technology—creating immediate retrofit demand. We’ve mapped this opportunity by ZIP code using Austin Water usage data:
| Target ZIP Code | Households (100k+ income) | Avg. Lawn Size (sq. ft.) | Current Irrigation Penetration | Estimated Retrofit Potential |
|---|---|---|---|---|
| 78757 (North Austin) | 8,240 | 7,200 | 58% | 3,400 homes |
| 78737 (Westlake Hills) | 5,610 | 12,500 | 72% | 1,550 homes |
| 78617 (Pflugerville) | 12,890 | 5,800 | 35% | 8,380 homes |
| TOTAL | 26,740 | 13,330 homes |
Competitor analysis reveals strategic gaps in our territory. RainMaster Irrigation dominates north Austin but outsources 40% of installations to subcontractors—resulting in inconsistent quality and voided manufacturer warranties. AquaScapes TX focuses exclusively on commercial work, ignoring residential retrofit opportunities. Sprinkler Medic’s franchise model forces standardized pricing that doesn’t reflect Austin’s soil challenges (high clay content requires specialized emitter spacing).
| Competitor | Residential Price/Sq.Ft. | Smart Tech Inclusion | Local Crew Ownership? | Key Weakness |
|---|---|---|---|---|
| RainMaster | $0.42 | +$185 option | No (Subcontracted) | 23% complaint rate with BBB |
| AquaScapes TX | $0.38 | Not offered | No (Regional crews) | No residential specialists |
| Sprinkler Medic | $0.45 | Standard | No (Corporate) | Rigid “one-size-fits-all” designs |
| GreenFlow | $0.48 | Standard | Yes (Owner-led) | Premium positioning |
Cash Flow Reality: We’re targeting 78757 ZIP code first despite lower household counts because its 7,200 sq. ft. average lawn size generates $3,456/project at $0.48/sq. ft.—$800+ more per job than smaller-lot suburbs. This accelerates our Month 14 break-even by funding working capital faster.
Commercial opportunity centers on Austin’s 2022 Municipal Code Chapter 25-8 requiring smart controllers for all new developments over 5,000 sq. ft. We’ve identified 17 active HOA projects through Travis County permit tracking, with average contracts of $22,500. Crucially, 80% include mandatory 2-year maintenance agreements at 8-12% of installation value—providing predictable recurring revenue.
Products & Services
This section transforms technical capabilities into revenue streams. For contractors, it must detail exactly how you package labor/materials into profitable offerings while addressing local regulatory constraints. Avoid generic service lists—every offering should solve a specific, quantifiable pain point for your target customer in your geographic area.
Example: GreenFlow Irrigation Solutions’ Products & Services
GreenFlow’s offerings are engineered for Austin’s unique environmental challenges: alkaline soil (pH 8.0+), 32-inch annual rainfall (vs. U.S. avg 38″), and Stage 3 water restrictions limiting usage to 2 days/week. Each service includes embedded efficiency features that justify premium pricing while reducing long-term client costs.
Residential Installation Process Flow:
- Soil analysis (using Texas A&M AgriLife Extension kits) to determine infiltration rates
- Zone mapping based on sun exposure/slope (critical for Austin’s hilly terrain)
- Smart controller programming with ET adjustment for Central Texas climate zone
- Backflow prevention installation per City of Austin Plumbing Code §1304.0
- 30-day post-installation water usage audit with comparison to pre-system baseline
Our unit economics model ensures profitability at every job size. Material costs are calculated based on Austin Pipe & Supply’s current pricing (verified monthly) with 35% markup:
| Component | Cost/Sq.Ft. | Markup | Revenue/Sq.Ft. | Notes |
|---|---|---|---|---|
| PVC Pipe (1″) | $0.18 | 35% | $0.24 | Includes 10% waste factor for rocky soil |
| Rotor Heads (Hunter PGP) | $0.07 | 35% | $0.09 | Required for lawns >5,000 sq. ft. |
| Smart Controller (Rachio 3) | $78 | 35% | $105 | Standard on all installations |
| Soil Moisture Sensor | $22 | 35% | $30 | Mandatory for Austin Water rebate eligibility |
| Labor | $0.15 | 58% | $0.23 | Based on 0.12 hrs/sq. ft. at $1.92/min |
| TOTAL | $0.42 | $0.48 | 55% gross margin |
Commercial offerings include mandatory features absent in residential work:
- Central Control Systems: Hunter ICC with cellular backup ($1,200+ installation) required for multi-site HOAs
- Municipal Compliance Package: Includes annual backflow certification ($100 value) and water usage reporting to Austin Water
- Emergency Override: Critical for Austin’s “Stage 4” restrictions (allowed during drought emergencies)
Our maintenance plans drive 32% of Year 3 revenue through structured retention:
| Plan Tier | Price | Components | Profit Margin | Retention Rate |
|---|---|---|---|---|
| Basic (Spring Startup) | $195 | System activation, leak check, controller reset | 68% | 42% |
| Essential (Winterization) | $175 | Blowout, valve box inspection, sensor test | 73% | 55% |
| Premium (Annual) | $495 | 2 seasonal services + 10% repair discount + water audit | 82% | 78% |
Operational Nuance: We charge $1.25/sq. ft. for properties under 4,000 sq. ft. (below our efficient crew size threshold). This 15% premium covers the 37% higher labor cost per sq. ft. for small jobs—preventing the “death by a thousand cuts” that bankrupts new installers.
Marketing & Sales Strategy
For local service businesses, marketing isn’t about brand awareness—it’s about hyper-targeted lead generation with measurable ROI. This section must detail exactly how you’ll acquire customers profitably within your service radius, including channel-specific conversion math. Vague “social media” promises without cost-per-lead metrics signal amateur execution.
Example: GreenFlow Irrigation Solutions’ Marketing & Sales Strategy
GreenFlow’s marketing allocates 6.75% of projected revenue to customer acquisition—deliberately below the industry average of 8-10% to accelerate profitability. We prioritize channels with verifiable plumbing/landscaping intent, avoiding broad awareness campaigns. All digital efforts target a precise 15-mile radius from our warehouse, eliminating wasted ad spend in unprofitable territories.
Channel-Specific Acquisition Math (Year 1):
| Channel | Monthly Spend | Leads Generated | Close Rate | CAC | LTV | LTV:CAC |
|---|---|---|---|---|---|---|
| Google Ads (Smart Campaigns) | $1,500 | 45 | 38% | $88 | $2,150 | 24:1 |
| Facebook/Instagram | $800 | 30 | 22% | $121 | $1,870 | 15:1 |
| HOA Partnership Program | $300 | 12 | 65% | $154 | $3,240 | 21:1 |
| Referral Program | $200 | 8 | 75% | $33 | $2,910 | 88:1 |
| Direct Mail (Postcards) | $400 | 10 | 15% | $267 | $1,420 | 5:1 |
| TOTAL | $3,200 | 105 | 32.4% | $285 | $2,150 | 7.5:1 |
Our sales process is engineered to overcome Austin homeowners’ top objection: “I’ll just buy a DIY kit.” The free consultation includes a comparative water cost analysis showing how our smart system pays for itself in 2.4 years through Austin Water rebates and reduced usage. For example:
Sample Homeowner ROI Calculation (5,200 sq. ft. property):
- Current manual system water cost: 18,000 gal/month × $8.25/1,000 gal = $148.50
- Projected smart system usage (40% reduction): 10,800 gal/month = $89.10
- Monthly savings: $59.40 × 12 months = $712.80/year
- Austin Water Smart Irrigation Rebate: $150 one-time
- System cost: $5,200 → Payback period: ($5,200 – $150) ÷ $712.80 = 7.08 years
Retention is built into service design: The 2-year warranty requires clients to use GreenFlow for repairs (generating $1,200 avg. revenue per service call at 65% margin). Maintenance plan members receive priority scheduling during Austin’s critical spring installation window (March-May)—a powerful incentive to renew.
Local Market Tip: In Williamson County, we adjust ad copy to highlight “drought-tolerant drip zones” (87% of new HOAs require xeriscaping). In Travis County, we emphasize “Barton Springs protection” compliance—proving hyper-local messaging beats generic campaigns.
Lead tracking uses Jobber’s source attribution to kill underperforming channels. If Google Ads CAC exceeds $110 for two consecutive months, we reallocate budget to referral programs—maintaining our 7.5:1 LTV:CAC target. Sales team commissions are structured to reward long-term value: 3% on installation revenue + 15% on maintenance contracts.
Operational Plan
This section proves you can deliver your service profitably at scale. For contractors, it must detail equipment logistics, technician workflows, and compliance protocols that directly impact job profitability. Vague statements like “we use quality tools” destroy credibility—investors need to see how you’ll maintain $1,200/day crew revenue with real-world downtime factors.
Example: GreenFlow Irrigation Solutions’ Operational Plan
GreenFlow’s operations are designed for maximum billable hours with minimal downtime—a critical metric in irrigation where weather delays average 17 days/year in Central Texas (NOAA data). Our crew productivity target: $1,350 revenue/day per technician (vs. industry avg $950) through optimized scheduling and equipment readiness.
Daily Crew Workflow (Residential Installation):
| Time | Activity | Revenue Impact | Compliance Check |
|---|---|---|---|
| 6:30 AM | Pre-trip vehicle inspection (DOT Form MCS-22001) | Avoids $1,200+ repair delays | Federal Motor Carrier Safety Regs |
| 7:00 AM | Load serialized equipment (Jobber scan) | Prevents 22-min average search time | Texas Water Code §16.002 |
| 7:30 AM | Arrive at job site | ||
| 7:45 AM | Verify utility locates (Call 811) | Avoids $5,000+ line strike fines | TX Statute §466.202 |
| 8:00 AM-12:00 PM | Trenching & pipe installation (0.12 hrs/sq. ft.) | $720 revenue (5,000 sq. ft. job) | Austin Plumbing Code §1308 |
| 12:00 PM | Lunch (unpaid) | ||
| 1:00 PM-3:30 PM | Controller programming & sensor calibration | $390 revenue | City of Austin Smart Device Ordinance |
| 3:30 PM-4:30 PM | Client walkthrough & water usage audit setup | $195 revenue | Austin Water Rebate Requirements |
| 4:45 PM | Return to warehouse; equipment check-in |
Equipment maintenance protocols prevent revenue-killing breakdowns. The Ditch Witch SC30 trencher (40% of job capacity) follows this schedule:
- Daily: Air filter inspection, hydraulic fluid check
- Weekly: Track tension adjustment, sprocket wear measurement
- Monthly: Hydraulic system flush ($185 cost)
- Annually: Undercarriage rebuild ($2,200)
This extends equipment life to 4.2 years (vs. industry avg 2.8 years), reducing depreciation costs by $7,800/year per vehicle.
Technology Stack ROI Analysis:
| Tool | Annual Cost | Revenue Impact | Net Value |
|---|---|---|---|
| Jobber (Field Service) | $1,440 | +$18,200 (12% faster scheduling) | +$16,760 |
| QuickBooks Online | $360 | +$4,500 (reduced accounting errors) | +$4,140 |
| RingCentral Phone | $1,200 | +$8,300 (call tracking conversion lift) | +$7,100 |
| Google Workspace | $120 | +$1,100 (shared calendar efficiency) | +$980 |
| TOTAL | $3,120 | +$32,100 | +$28,980 |
Cash Flow Reality: We require 50% deposit on commercial projects over $10k to cover upfront material costs. This prevents the $8k-$12k working capital gap that causes 23% of new irrigation contractors to fail in Year 1 (IBISWorld).
Compliance is embedded in operations: All technicians complete Texas A&M’s Water University certification (8 hours/year) to maintain TDLR license. Backflow test reports are auto-submitted to Austin Water via secure API, avoiding the $250/month late fees competitors pay. Crew vehicles display full TDLR license numbers—proving legitimacy to skeptical homeowners.
Financial Plan
This is the operational heartbeat of your business. For contractors, it must reconcile equipment costs, labor rates, and seasonal revenue swings into a viable cash flow model. Generic P&L statements fail—your numbers must reflect real-world field service variables like weather downtime, material waste, and technician turnover costs.
Example: GreenFlow Irrigation Solutions’ Financial Plan
GreenFlow’s financial model prioritizes cash flow resilience over aggressive growth. We maintain 3 months of operating expenses ($41,400) as working capital to survive Austin’s seasonal revenue dip (December-February accounts for just 18% of annual revenue). All projections include conservative weather delay buffers—15% reduced billable days versus theoretical maximums.
Startup Cost Breakdown (Validated with Local Vendors):
| Item | Cost | Vendor | Justification |
|---|---|---|---|
| 2020 Ford F-250 XL (16k GVWR) | $32,000 | Ross Ford, Austin | Required for Ditch Witch SC30 transport; 3-year depreciation |
| Ditch Witch SC30 Trencher | $24,500 | Rent-A-Ditch Austin | Financed through vendor; 80-hour/month job capacity |
| Compact Vibratory Plate (Wacker RT7) | $8,200 | United Rentals | Critical for clay soil compaction; avoids trench collapse |
| Backflow Testing Kit (Zurich Z2) | $2,300 | Texas Safety Controls | Mandatory for Austin Water certification |
| Website Development | $3,800 | Local Austin agency | Includes water usage calculator and permit lookup tool |
| Google Ads Prepayment | $4,500 | Secures $5k bonus ad credits for new businesses | |
| TOTAL | $150,000 |
Revenue projections are grounded in Austin-specific capacity limits. Our Year 1 crew can complete:
- Maximum jobs/month: 8 residential (5,000 sq. ft. avg)
- Weather-adjusted jobs/month: 6.2 (15% downtime)
- Annual capacity: 74.4 jobs → 60 jobs (conservative booking)
This validates our $312,000 residential revenue target (60 × $5,200). Commercial work is capped at 2 projects to avoid overextension—each requires 3x the oversight of residential jobs.
36-Month Cash Flow Projection (Key Months):
| Month | Revenue | Operating Expenses | Loan Payment | Net Cash Flow | Cumulative Cash |
|---|---|---|---|---|---|
| Month 1 | $8,200 | $24,500 | $0 | -$16,300 | $133,700 |
| Month 6 | $38,500 | $28,200 | $1,200 | $9,100 | $98,400 |
| Month 12 | $42,000 | $30,800 | $1,200 | $10,000 | $72,600 |
| Month 14 | $46,300 | $31,200 | $1,200 | $13,900 | $0 |
| Month 24 | $62,500 | $48,700 | $1,200 | $12,600 | $156,200 |
Break-even math: Fixed costs = $272,727 (rent, insurance, software, loan payments). Contribution margin = 55% ($0.48 revenue – $0.22 variable cost per sq. ft.). Break-even revenue = $272,727 ÷ 0.55 = $495,867. But wait—our gross margin is 58.3%? The discrepancy comes from:
- Year 1 commercial projects have 52% margin (vs. 58.3% residential)
- Startup phase material waste at 12% (industry avg 8%)
- Owner draw not counted as expense until profitable
Thus, effective contribution margin = 55% for break-even modeling. At $5,200 avg. job, we need 95 jobs ($495,867 ÷ $5,200) to break even. Our Month 14 projection (78 jobs completed) assumes accelerated commercial work in Q2 Year 2.
Financial Control Tip: We track “job profitability variance” weekly—comparing actual material/labor vs. estimates. A 5% negative variance triggers immediate process review. This caught a $3,200 leak in PVC waste during Month 3, saving 8% of projected Year 1 profit.
Risk Analysis & Mitigation
For contractors, risk isn’t theoretical—it’s daily trench collapses and permit denials. This section must prove you’ve stress-tested your model against hyper-local threats (like Austin’s flash floods) with specific, budgeted countermeasures. Generic “we’ll monitor risks” statements signal unpreparedness to seasoned operators.
Example: GreenFlow Irrigation Solutions’ Risk Analysis & Mitigation
GreenFlow quantifies risks by potential financial impact and probability, allocating 4.2% of revenue to mitigation. Unlike competitors who treat insurance as a compliance checkbox, our plan addresses irrigation-specific vulnerabilities that cause 68% of contractor bankruptcies (NAIC 2023).
| Risk | Probability | Financial Impact | Mitigation Action | Cost |
|---|---|---|---|---|
| Equipment Breakdown (Trencher) | 72%/year | $4,200 revenue loss/day | Preventive maintenance fund + rental contract with Rent-A-Ditch | $1,800/year |
| Water Line Strike | 1.2%/job | $8,500 average repair + $2,000 fine | Mandatory 811 locates + $1M equipment liability insurance | $750/year |
| Seasonal Revenue Drop (Dec-Feb) | 100% | $12,000 monthly shortfall | Winterization service push + commercial contract buffer | $0 (revenue shift) |
| Tech Certification Lapse | 28%/year | $5,000 fines + work stoppage | Automated TDLR renewal alerts + $500 bond | $300/year |
| Material Price Spike (PVC) | 35%/year | 8% margin erosion | 60-day fixed-price contracts with Austin Pipe & Supply | $1,200/year |
Our most critical risk—municipal regulation changes—is addressed through real-time monitoring. Austin’s 2023 water restrictions update gave contractors just 30 days to comply with new smart controller mandates. GreenFlow’s mitigation:
- Subscribe to Austin Water Regulatory Alerts ($0)
- Allocate 2% of revenue to compliance updates (e.g., $8,000 in Year 3)
- Maintain certified backflow tester on staff (required for all installations)
Cash flow risks are managed through dynamic reserves:
| Reserve Type | Target | Funding Source | Purpose |
|---|---|---|---|
| Operating Reserve | 3 months expenses ($41,400) | Startup capital | Seasonal revenue gaps |
| Equipment Reserve | $10,000 | 1.5% of revenue | Trencher rebuilds/repairs |
| Regulatory Reserve | $5,000 | 0.5% of revenue | Emergency compliance updates |
| TOTAL | $56,400 |
For weather delays (17 days/year avg), we’ve built buffer days into contracts. Jobs booked in March include 3 “weather days”—allowing completion by May 15 even with 5 rainy days. This prevents the 22% cancellation rate competitors face during Austin’s spring rains.
Operational Nuance: We require $500 non-refundable deposits for April-May slots. This captures $15k in prepayments during our cash-strapped Q1, while the non-refundable clause covers mobilization costs if weather forces cancellation.
Labor risks are mitigated through non-traditional retention: Technicians earn 2% of maintenance plan revenue from their clients. A crew servicing 40 homes generates $396/year in passive income—reducing turnover from industry’s 32% to our target 12%. All hires sign non-solicitation agreements compliant with Texas Covenants Not to Compete Act.